Publishing House SB RAS:

Publishing House SB RAS:

Address of the Publishing House SB RAS:
Morskoy pr. 2, 630090 Novosibirsk, Russia



Advanced Search

Journal of Mining Sciences

2025 year, number 3

Optimization Analysis of Mediumto Long-Term Ore Drawing Schedule Based on MIP in Block Cave Mining

Zhuli Ren 1,2, Ruifu Yuan 1,2, Liguan Wang 3, Feng Du 1,2, Haokun Deng1,2
1School of Energy Science and Engineering, Henan Polytechnic University, Jiaozuo, China
2Collaborative Innovation Center of Coal Work Safety and Clean High Efficiency Utilization, Jiaozuo, China
3School of Resources and Safety Engineering, Central South University, Changsha, China
Keywords: Block cave mining, drawing scheduling optimization, mixed integer programming, the medium- to long-term scheduling, ore-rock mixing, draw points priority

Abstract

The mining drawing schedule is related to the safety, environment and ground pressure control of mine production, and is of great significance for controlling the economic indicators of mine operation in block cave mining. The mixed integer programming(MIP) method has been proved to be very effective in solving the medium- to long-term drawing sequence optimization problem in mines. The amount of ore, three kinds of the draw points priority order with diamond undercutting mode, and the logical relationship are considered as constraints based on the value model of ore-rock mixing. The maximizing net present value of the mining operation is used as objective function. Application and analysis of the model is solved using CPLEX, MATLAB, and YALMIP for a specific Chinese copper mine using 770 drawpoints over 7-year (28-quarter) periods.