Journal of Mining Sciences

2019

Number: 1

12781.
Maximum Strength of Opening in Crack-Weakened Rock Mass

V. M. Mirsalaimov1,2
1Azerbaijan Technical University, Baku, AZ1073 Azerbaijan
2Institute of Mathematics and Mechanics, Azerbaijan National Academy of Sciences, Baku, Azerbaijan
Keywords: Горный массив, выработка максимальной прочности, трещина, коэффициенты интенсивности напряжений, минимизация напряженного состояния, Rock mass, maximum strength opening, crack, stress intensity factor, stress state minimization

Abstract >>
Based on the uniform strength and minimized stress intensity factor, the maximum strength shape of an opening in rock mass is theoretically analyzed. The criterion and solution method are proposed for the problem on prevention of failure in rock mass with opening under the action of tectonic forces and gravity. The constructed closed system of algebraic equations enables minimization of stress intensity factors depending on mechanical and geometrical parameters of rock mass.



Number: 1

12782.
Modeling Shock Wave Processes in a Mine Opening with Permeable Barriers

V. M. Fomin1,2, B. V. Postinkov1,2, V. A. Kolotilov1,2, V. S. Shalaev3, Yu. V. Shalaev3, N. F. Florya3
1Khristianovich Institute of Theoretical and Applied Mechanics, Siberian Branch, Novosibirsk, 630090 Russia
2Novosibirsk State University, Novosibirsk, 630090 Russia
3Shaktpozharservis Research and Production, Kemerovo, 650000 Russia
Keywords: Ударная волна, горная выработка, взрыв, проницаемая преграда, Shock wave, mine opening, explosion, permeable barrier

Abstract >>
The results of numerical modeling of intense shock wave propagation after explosion in a mine opening with permeable barrier are presented. The problem is solved in the equilibrium inviscid formulation without regard to chemical reactions and with averaged composition of mine air. It is shown that for a screen composed of four similar permeable barriers arranged as a labyrinth, the incoming shock wave has a strongest impact on the first barrier. As a consequence of weakening of the shock wave front on the first barrier, the rest barriers experience much less loading. In order to decrease peak loads on a load-bearing metal structure, it is necessary to reduce areas of their flat front surfaces.



Number: 1

12783.
Determination of the Most Suitable Working Height of a Powered Roof Support Considering Roof Stresses

M. E. Yetkin, F. Simsir
Dokuz Eylul University
Keywords: Механизированная крепь, рабочая высота, численное моделирование, Powered roof support, working height, numerical modeling

Abstract >>
In order to meet the increasing demand to coal, longwalls having large working heights up to 7.3 m are being operated worlwide. As the working heights increase, the load-bearing capacities of powered roof supports used at such longwalls are to be raised too. From a powered roof support it is expected that it safelybears the roof loads and transmits them to the footwall at different working heights. This article presents the results of numerical analyses on roof stresses at different longwall working heights. In order to determine the most suitable longwall working height, average stress distributions that occur on roof and gob zones are calculated for different longwall working heights. For this purpose, numerical models are built up and the procedure is applied to a real-life underground coal mine. Six distinct longwalls are modeled considering rock mass properties and working heights. In conclusion, the most suitable longwall working height for the mine under study is determined considering stresses occurring on roof strata and the gob zone.



Number: 1

12784.
The Grain Size Distribution of Blasted Rock

T. Fraszczak1, T. Mutze1, B. Lychatz2, O. Ortlepp3, U. A. Peuker1
1Institute of Mechanical Process Engineering and Mineral Processing, Freiberg, 09599 Germany
2Institute of Iron and Steel Technology, Freiberg, Germany
3Wunschendorfer Dolomitwerk, GmbH, Wünschendorf/Elster, Germany
Keywords: Взрывная отбойка, гранулометрический состав, доломит, ситовая установка, щековая дробилка, Rock blasting, grain size distribution, dolomite, sieve plant, jaw crusher
Subsection: ROCK FAILURE

Abstract >>
The determination of the grain size distribution of blasted rock exceeds the capability of an analytical sieving machine which only gives reliable results within a range of 63 µm to 125 mm. Other sophisticated methods are often not available for particle size measurement in coarse-grained applications in medium scale mining. Therefore, an alternative low cost method to investigate the grain sizes of blasted rock is introduced which can cover a range from 63 µm at the lower end without an upper limit. Three different options to examine blasted dolomite grains are investigated and combined with sieve analysis to determine a complete sieving equivalent grain size distribution. Comparison with results of a technical sieving shows that this method gives a good approximation of the size distribution, improving the possibilities for design of mineral processing equipment.



Number: 1

12785.
Application of Textural Features in the Analysis of Breakstone Grading

A. I. Makarov1, V. A. Ermakov1, D. A. Ekimov1,2
1Institute of Physics and Technology, Petrozavodsk, 185910 Russia
2Department of Multidisciplinary Scientific Research, Karelian Research Center, Russian Academy of Sciences, Petrozavodsk, 185910 Russia
Keywords: Гранулометрический состав, автокорреляционная функция, текстурный подход, Grain size composition, autocorrelation function, texture approach
Subsection: ROCK FAILURE

Abstract >>
Accuracy of breakstone grain-size analysis using digital images in the initial method and its modification based on algorithm proposed by Rubin is compared. A modification with averaging of features over all directions and the method with a classification feature represented by difference of intensity distribution functions of fragment projections are described. The results obtained using these methods in a series of tests on grading of five breakstone fractions measured in a certified laboratory. It is shown that the modified method by Rubin with averaging over all directions provides the highest accuracy.



Number: 1

12786.
Development of a Match Factor and Comparison of Its Applicability with Ant-Colony Algorithm in a Heterogeneous Transportation Fleet in an Open-Pit Mine

A. Dabbagh, R. Bagherpour
Isfahan University of Technology, Isfahan, 8415683111 Iran
Keywords: Организация очереди, открытая разработка месторождения, отгрузка, алгоритм муравьиной колонии, детальный коэффициент соответствия, Queuing, open pit mine, detailed match factor, dispatching, ant-calony algorithm

Abstract >>
In a transportation fleet in open-pit mines, the match factor is defined between loading and dumping vehicles. This factor helps in indicating the number of vehicles that depend on each other. In this study, a new parameter termed the “detailed match factor” is developed to improve the transportation fleet and relationships are deduced to control the production and grade. A transportation fleet model was simulated for a typical iron ore mine and was solved using both the detailed match factor and ant-colony algorithm methods. The detailed match factor helped in increasing the production by 10.6%



Number: 1

12787.
Evaluation of Cutter-Loader Efficiency in Coal Seam with Variable Geomechanical and Geotechnical Characteristics

a:2:{s:4:"TYPE";s:4:"HTML";s:4:"TEXT";s:117:"A. A. Ordin1,2, V. V. Okol’nishnikov1, S. V. Rudometov1, A. A. Metel’kov3";}
1Institute of Computational Technologies, Siberian Branch, Russian Academy of Sciences, Novosibirsk, 630090 Russia
2Chinakal Institute of Mining, Siberian Branch, Russian Academy of Sciences, Novosibirsk, 630091 Russia
3Giprougol, Novosibirsk, 630015 Russia
Keywords: Шахта, угольный пласт, мощность, сопротивляемость пород резанию, очистной комбайн, скорость подачи, производительность, система имитационного моделирования, Mine, coal seam, thickness, cuttability, cutter-loader, advance feed, capacity, simulation system

Abstract >>
Using inverse distance weighting (IDW), the model of a coal seam with distributed geological and geomechanical characteristics is developed. The hyperbolic dependences of the cutter-loader advance feed and capacity on the coal seam thickness are found. Influence of coal face spalling on cutter-loader capacity is assessed. Using the specialized library of MTSS, the integrated model of process flows in coal face area is developed. It is found that there exists cutter-loader capacity maximum at the increasing dependence of coal cuttability on longwall length.



Number: 1

12788.
Backfilling Mixture Preparation Using Milled Granulated Blast-Furnace Slag

L. A. Krupnika1, Yu. N. Shaposhnikb2, S. N. Shaposhnikc3, G. T. Nurshaiykovac3
1Satpaev Kazakh National Research Technical University, Almaty, 50013 Republic of Kazakhstan
2Chinakal Institute of Mining, Siberian Branch, Russian Academy of Sciences, Novosibirsk, 630091 Russia
3Serikbaev East Kazakhstan State Technical University, Ust-Kamenogorsk, 070000 Republic of Kazakhstan
Keywords: Закладочные смеси, цементно-зольное и цементно-шлаковое вяжущие, молотые доменные гранулированные шлаки, прочностные характеристики, реологические свойства закладки, закладочные работы, Backfilling mixture, cement-ash and cement-slag binders, milled granulated blat-furnace slag, strength characteristics, rheological properties, backfilling operations

Abstract >>
Backfilling mixture preparation technology using a cement-slag binder is developed for Artem mine. It is shown that backfill with granulated blast-furnace slag reaches project strength when slag is to 80% milled down to 80 μm. The authors analyze influence of milling fineness of granulated blast-furnace slag from different manufacturers on strength and rheological properties of backfill. The economic analysis of cost of binder in formation of load-bearing layer of backfill prepared using fly ash and milled granulated blast-furnace slag is performed.



Number: 1

12789.
Geodynamic Hazard Assessment for Tectonic Structures in Underground Mining of North Ore Bodies in the Oktyabrsky Deposit

V. A. Uskov1, A. A. Eremenko1, T. P. Darbinyan2, V. P. Marysyuk3
1Chinakal Institute of Mining, Siberian Branch, Russian Academy of Sciences, Novosibirsk, 630091 Russia
2Mine Management, Polar Division, Nornickel, Norilsk, 663302 Russia
3Center for Geodynamic Safety, Polar Division, Nornickel, Norilsk, 663302 Russia
Keywords: Геодинамическое районирование, блочное строение, тектонические структуры, напряженно-деформированное состояние массива, разломы, ударопасность, горные работы, разработка, камеры, закладка, Geodynamic zoning, block structure, tectonic structures, rock mass stress state, faults, rockburst hazard, mining, stopes, backfill

Abstract >>
Various-rank tectonic structures are distinguished in the Norilsk Region. The first-order block structure is formed by intersection of rank I geodynamically active faults: Khatanga, Imangda-Kystykhtakh, Norislk, Fokin-Tangaralakh and other. Rank II faults are the Norilsk-Kharaelakh fault, which intersects the mine field, and other 7 structures. Using geological sections and boring records obtained within the mining lease, dip slips and oblique-slip faults of rank III, represented by ridges in the terrain, are plotted in the satellite image. In the rockburst-hazardous high-grade ore sites in Glubokaya mine, it is recommended to make safe zone by advance boring of destressing holes in underground openings in zone of rank III faults.



Number: 1

12790.
Linear Model of Location Optimization Exploitation and Consumption of Limestone on the Example of Macedonia

T. Bosevski1, S. Vujic2, M. Radosavljevic2, M. Kuzmanovic3
1Rudproekt Skopje, Scopje, 100 Macedonia
2Mining Institute Belgrade, Belgrade, 11080 Serbia
3University Belgrade, Belgrade, 11000 Serbia
Keywords: Добыча, потребление, известняк, линейная модель, ограничивающие факторы, Optimization, linear location model, linear programming, exploitation and consumption of limestone, Macedonia

Abstract >>
Predicting the consequences of changes in a system such as the system of exploitation and consumption of limestone is a problem that requires an adequate analytical approach and encompasses all the limiting factors, their performance, dependence, desirable and non-desirable changes, and completion of the set goal or multiple goals. Without forming the mathematical model and applying the adequate solving method, it is not possible to solve the problem on the optimal level. This paper shows the linear model of location exploitation optimization and consumption of limestone in Macedonia, with 29 production entities - open-pit mines, and two options of consumption entities, with 15 and 16 lime consumers. By changing one of the starting presumptions, the number of consumers, the research shows that mathematical model approach with adequate sensitivity to changes of relative parameters is necessary for a complete and reliable overview of system behavior.




Articles 12781 - 12790 of 30389